| Views: |
7587 |
| Downloads: |
2086 |
|
 |
Seattle Terminal Radar Approach Control
Unique views:
7587 (20 in 7 days)
Unique downloads:
2086 (4 in 7 days)
Unique Google Earth model clicks:
1140 (5 in 7 days)
|
|
|
Organize
Share
▼
|
Please sign in to add this model to a collection. |
|
|
|
This building houses air traffic control and electronic equipment spaces, offices for management and facilities maintenance personnel, and various mechanical, electrical, and telecommunications areas. The design and construction of this building incorporated significant changes to current building standards in order to provide for a lessened impact on the environment, both during construction and over the life of the building. The building incorporates energy-efficient design strategies while maintaining all the operational and security features of a standard TRACON facility. This is the Department of Transportation's first LEED certified building.
Translate
Show original
|
|
Complexity is based on the number of polygons in the model. More complex models render more slowly in Google Earth. Learn more about this on our knowledge base.
|
| energy efficient, department of energy, DOE, Integrated team, Green framework, Simulation, Green specifications, Commissioning, Performance measurement and verification, Operations and maintenance, Transportation benefits, Open space preservation, Wetlands, Stormwater management, Drought-tolerant landscaping, Glazing, HVAC, Lighting control and daylight harvesting, Efficient lighting, Recycled materials, Local materials, Certified wood, C&D waste management, Occupant recycling, Daylighting, Ventilation effectiveness, Thermal comfort, Low-emitting materials, Indoor air quality monitoring |
|