| Visualizzazioni: |
2160 |
| Download: |
502 |
|
 |
Jacobson-Olsen
Visualizzazioni uniche:
2160 (3 in 7 giorni)
Download unici:
502 (0 in 7 giorni)
Clic unici per modelli in Google Earth:
616 (1 in 7 giorni)
|
|
|
Organizza
Condividi
▼
|
Accedi per aggiungere il modello a una raccolta. |
|
|
|
Overlooking the North end of the Iowa State Jack Trice Stadium are the Olsen and Jacobsen Buildings. The Olsen Building was completed in 1975 along with the new football stadium. The building, named for Ralph Olsen, houses the football locker rooms, training and rehab areas, and strength and conditioning facilities and the Athletic Ticket Office. It was considered to be the finest athletic training facility in the Big 8 Conference, but the building was eventually outdated and the Jacobsen Athletic Building, named for Richard O. Jacobsen, was added onto the South end of it in 1996. The state-of-the-art building is home to Iowa State University football offices, team meeting rooms, locker rooms, and an auditorium. Except for the men and women basketball offices, the building allows all staff members of the athletic department to be under one roof. The project added a natural grass field after 20 years of having an artificial surface, but the capacity was reduced from 50,000 to 43,000. Completion of the Jacobsen building was just in time for Coach McCarney second season and the Cyclones first season in the Big 12 Conference. Modeled by Benjamin Schwartz.
Traduci
Mostra originale
|
|
| Altri modelli di csc:
|
|
| Altri modelli che potrebbero interessarti:
|
La complessità si basa sul numero di poligoni presenti nel modello. Modelli più complessi hanno un rendering più lento in Google Earth. Puoi ottenere ulteriori informazioni in merito nella nostra knowledge base.
|
|