Magazyn 3D Kreator budynków SketchUp
polski | Zaloguj się
 
Australian Power Stations > Hume Dam  
Hume Dam
przesłane przez: KangaroOz 3D dnia 06.06.09
Obraz
Mapa
Hume Dam
Wyświetlenia: 4686
Pobrane pliki: 1754
Wyświetl wykres

Organizuj Udostępnianie
13 ocen
Wyświetl oceny i opinie
Oceń ten model
Wyświetl oznaczenie lokalizacji w Google Earth
Hume Dam is located immediately downstream of the Murray River and Mitta Mitta River confluence, 16 kilometres east of Albury-Wodonga. The dam is 305 km from the mountain source and 2,225 km from the Murray mouth at Goolwa. The construction of the Hume Dam commenced on 28 November 1919 and was completed in 1936. The construction site was initially referred to as ‘the Mitta Mitta Dam site', but in February 1920 the River Murray Commission adopted the name ‘Hume Reservoir' to honour Hamilton Hume, who was one of the first Europeans to see and cross the River Murray. Hydro-electric generation of 60 MW for a capacity of 3,036,500 ML.


Poinformuj o naruszeniu zasad polityki
Utworzono w SketchUp

Ten model został utworzony w programie SketchUp, narzędziu do tworzenia modeli 3D firmy Trimble. Więcej informacji »
SketchUp
Kolekcje zawierające ten model
 
Podobne elementy
Więcej modeli użytkownika KangaroOz 3D:
 
Inne modele, które mogą Cię zainteresować:
 
Poziom złożoności modelu   Co to jest?
Proste
Umiarkowane
Złożone
Tagi
HumeWeirDamBarrageMurrayRiverMitta MittaGourlburnG-MWaterHydroElectricPowerStationIndustryVictoriaNew South WalesAustralia

Portions ©2013 Trimble Navigation Limited - Portions ©2013 Google - Google's Privacy Policy - Trimble's Privacy Policy - Warunki korzystania z usługi - Trimble Home - Strona główna Google - Pomoc - Forum