| Views: |
2208 |
| Downloads: |
315 |
|
 |
Heavy Machinery Laboratory
Unique views:
2208 (6 in 7 days)
Unique downloads:
315 (1 in 7 days)
Unique Google Earth model clicks:
0 (0 in 7 days)
|
|
|
Organize
Share
▼
|
Please sign in to add this model to a collection. |
|
|
|
This building is similar to the adjacent Engineering I Building and is also built in the Brazilian style. Completed in 1958, the building was extended in 1982 to include working space for the Department of Mechanical Engineering for the testing of mechanical structures. The building also comprises a wind tunnel for the testing of the aerodynamics of prototypes.
Sketchup model drawn by Mnr D Olivier
Translate
Show original
|
|
Complexity is based on the number of polygons in the model. More complex models render more slowly in Google Earth. Learn more about this on our knowledge base.
|
|