Quabbin Education Support Center
檢視次數:
1347 次 (過去 7 天內共 10 次)
下載次數:
549 次 (過去 7 天內共 3 次)
Google 地球模型實際點閱人次:
共 33 次 (過去 7 天內共 0 次)
|
|
The new administrative building for the Quabbin Regional School District is a 7800-sf, single-story, wood- and steel-framed structure on a full, heated, accessible basement. The site is located three miles from the center of Barre, Massachusetts, adjacent to an existing High School. It has parking space for 37 vehicles and is served by municipal water and sewer. This is a publicly funded building, which has achieved a high performance in spite of being constructed within the Massachusetts public bid law requirements.
翻譯
顯示原文
|
|
複雜度以模型中的多邊形數為基礎。越複雜的模型成像,在 Google 地球中的處理速度越慢。請到我們的 知識庫 上來瞭解更多有關這部分的資訊。
|
| energy efficient, department of energy, DOE, Integrated team, Simulation, Green specifications, Performance measurement and verification, Operations and maintenance, Stormwater management, Massing and orientation, Insulation levels, Glazing, Airtightness, HVAC, Lighting control and daylight harvesting, Efficient lighting, Durability, Benign materials, Recycled materials, Daylighting, Ventilation effectiveness, Moisture control, Thermal comfort, Noise control, Low-emitting materials, Indoor air quality monitoring |
|